Bread fermentation equipment

I have known lots of opinions about the bread fermentation and I want to give my own opinion viewed from the 37 years of research and observation.

In the 70s the owner of a factory-baked in Badalona (Spain) requested an electric steam boiler for his bakery and also requested my assistance in the installation and start-up.

The baker told me that there is not a useful system to improve the bread quality and that I should research about it.  When the work was finished, back in Madrid I stopped in a bookshop and bought some books about the bread manufacture.

In 1979 as a result of a long research our R+D department developed, designed and manufactured climate-control equipment for fermentation chamber to improve the bread fermentation. Nowadays there are more than 2000 equipments installed in Spain and some overseas.

At the beginning I had the opportunity to stay more than 300 nights in bakeries in order to control the equipment efficiency and to verify that the quantity of leavening was reduced from 5% to 1%.

The bread should be making with flour, water and salt, without chemistry otherwise is only food without nutritional value.

The bread should have a 0.5% of leavening and the process of fermentation should be done in a room constructed with bricks, with good isolation and tiles.

The fermentation room should have a 35ºC 80% humidity, stratification absence, electromagnetic camps absence and oxygen presence, a tropical climate.

As I told before the market is full of bread with zero nutritional value.

There is a baker who does the bread without chemical ingredients, without leavening, we have done some test to determinate the nutritional value of this bread and the conclusion is that who eats 100gr of bread with chemical ingredients and leavening in 90 minutes is hungry and who eats 100gr of bread without leavening Flor de Cereales, the person is not hungry in about 8 hours. This bread is suitable for people who want loss weight.

The baker from Flor de Cereales has the fermentation chamber with a climate-control model Lauda manufactured by Ete, creating a tropical climate.

The Flor de Cereales dough is made with flour, water and salt. The bread preservation is more than a month and before consume is recommended to warm it in the oven or toaster.

The bakers who make bread using fermentation chambers with climate-control Lauda ETE can make excellent bread with natural scent, flavor, conservation and high nutritional value.

If we want that the bread as nourishment we cannot use chemical, if you want to success in your business as baker make the bread with the same formula used 5000 years ago.

The Europea Termica Electrica technicians will advice you about the chamber fermentation construction and about the climate-control suitable for each case.

Pool Water Heaters, Coolers for pools and Coolers for showers…

Pool Water Heater.- Since 1977 ETE supplies electric equipments for this service with written guarantee. Our pool water heaters are suitable for swimming pools, relaxing pools and hydro-massage pools. The pool water heaters have 10 years guarantee. The pool water heater’s installation cost and maintenance are inexpensive.Wellness Center Equipments

Water heaters for showers.- The hot water for showers is easy to solve installing the water heaters manufacture by ETE since 1977. The water heaters for showers does not need chimney, storage fuel tank, it does not exist explosion/fire risk.

Coolers for toning pools and showers.- The sports installations (gyms, country clubs, spa-wellness centers) needs to improve their installations given to their clients something else like vitality; it is important to have a toning pool 8ºC and vitality showers 4ºC. If in your installation this system does not exist do not hesitate to contact us for more information. Once you have it you will see an after and before in your clients and in your business. Happy clients more income.

Selfclosing shower.- To save water and energy ETE has developed the selfclosing showers with electronic start up. There are two models: one selfclosing shower normal and other with mixer tap in order to give service for hot water (40ºC) and cold water (4ºC).

Swimsuit dryers.- The swimsuit dryers are an important service in the pools and Wellness centers, the swimsuit dryers manufactured by ETE gives a luxury service for your clients. It is in the market since 2003 and by now are hundreds of them installed around the world. It is pleasing to pack away the swimsuit dry; the clients will evaluate the service.

The swimsuit dryers can be a business when are installed with coin machine to charge 0,20€ for the service.

If in your country are many pools you can install 2 equipments with the coin machine system (one for each looker room) and the owner will give a good service without investment.

Europea Termica Electrica is on your disposal to study the best option for your pool, wellness center, gym. Our technical department will study your requirement for hot water showers, pool water heaters, coolers for pools/showers.

Industrial Boiler Cost-effective

Which are the elements to determinate if an industrial boiler is cost-effective?

1.- PriceIndustrial boilers

2.- Installation costs

3.- Maintenance costs

4.- Useful life

5.- Efficiency

6.- Energy cost

7.- Breakdowns.

I do remember a case in an industry located in Spain, they needs were to melt plastic through a press. Our technical department proposal was to install a 60kw electric thermal oil boiler for each press; they have 10 presses in total.

Finally this industry rejected our proposal; the electric boilers price was the determinant factor. Two years later I was informed that the boilers were cracking the oil, blocking pipes and heating coils. The maintenance costs was higher than they expected, in order to keep the process going they had to stop producing to clean pipes, heating coils even buy new valves and recirculation pumps each year.

Their supplier recommended for each press 150kw electric thermal oil boiler due to the boilers efficiency.

Our proposal was 60kw electric thermal oil boiler due to our technology and high efficiency. Our electric thermal oil boiler does not crack the oil, maintaining the oil properties as a lubricant for all its life.

As you see this industry was forced to install 1500kw instead of 600kw, wasting 5,400€ for power term, in Spain the energy companies charge 6€ per each kWh.

About other installations, the energy used is fuel and they are obliged to install a fuel tank, pumps, burners, chimneys and fire/explosions security systems.

The electric boiler manufactured by ETE only requires electric installation and hydraulic connections.

The maintenance expenses are low, the superheated electric boiler, electric thermal oil boiler and electric water boiler does not need any maintenance. The steam electric boiler needs water treatment.

The industrial electric boilers manufactured by ETE are in the market since 1977, we monitoring the boilers installed since 1980 until now and they are still working without breakdowns and the same efficiency as the first day (100%).  Our experience allows to give to our clients 10 years guarantee in: industrial electric water boilers, industrial superheated water boiler, industrial electric thermal oil boiler and 5 years guarantee for the industrial electric steam boiler.

Nowadays the energy cost is the same between them (electricity, fuel oil, etc.) with advantage for the electricity as consequence of its production through renewable energy. The industry that have high energy consumption they have a lower electric energy prices and cheaper than fuel energy.

The electric boilers ETE has been designed and manufactured with components thought to last years without breakdowns. Any of our clients can confirm it.

It is important to value the breakdown cost, what happens if the productions stops and you cannot deliver the orders.

It is obvious that the electric boiler price is only one factor to be evaluate in order to define if the industrial electric boiler is inexpensive, you should consider that the boiler price will pay once but the rest are heavy expenses that will should pay as long the process last.